Ridgeview Farmhouse
A 1923 farmhouse that had been renovated three times badly. We took it back to the frame, kept the parts worth keeping, and spent a year arguing about the kitchen.
View projectAn interior design studio in Rhinebeck, New York. We work on old houses mostly, and we are unhurried about it.
See the workA 1923 farmhouse that had been renovated three times badly. We took it back to the frame, kept the parts worth keeping, and spent a year arguing about the kitchen.
View projectA new build on a difficult lakeside lot, where the clients wanted something that would look like it had always been there without pretending to be old.
View projectNine hundred square feet of pre-war Brooklyn, three doors, and a client who reads more than anyone we have ever worked for. Mostly a storage problem.
View projectBefore drawings, before budgets, we want to know how you actually live in the house: which rooms you avoid, where the mail lands, what you have been meaning to fix for six years.
Layouts, light studies, a material palette you can hold. We work in physical samples rather than renders, because nobody has ever been disappointed by a render.
Drawings your builder can actually price and build from, plus the schedules, specifications, and the long unglamorous list of decisions that prevents surprises later.
We are on site regularly, we answer the builder's questions quickly, and we stay through the last day, when the furniture lands and the house finally reads as one thing.
We specified it on four projects in a row and then went back to look at all four. What it does well, what it does badly, and who should not use it.
Marble marks. Limestone stains. Every durable surface is a negotiation with how much patina you can live with, and most people decide this too quickly.
The rooms people love most in our projects are usually the ones we stopped working on early. An argument for restraint, with evidence.
We take on four or five projects a year. These are the ones we are allowed to show, which is not all of them.
A 1923 farmhouse that had been renovated three times, each time worse than the last. We took it back to the frame, kept what was worth keeping, and spent most of a year on the kitchen.
The house had good bones and a terrible plan.
When the clients bought it, the kitchen was in the darkest corner of the ground floor, the back porch had been enclosed in the 1980s to make a windowless den, and a load-bearing wall had been removed at some point by somebody who did not replace it with anything. The staircase was beautiful. Almost nothing else had survived intact.
Our first proposal was to move the kitchen to the south-east corner, where the morning light is, and to open the enclosed porch back up. Both of those meant structural work, and both of them were more expensive than the clients had hoped. We spent two months making the case, and in the end the thing that persuaded them was not a drawing but an afternoon: we asked them to sit in the dark corner at 8am and then in the south-east room at 8am.
Demolition turned up what demolition usually turns up. The 1980s work had been done directly over the original lath, the chimney had been capped without being vented, and there was a complete second layer of flooring hiding underneath the kitchen vinyl. Some of this was good news: the original pine floors were intact under two later layers, and once lifted, cleaned and finished they became the single best material in the house.
We kept: the staircase, the original floors, three of the five fireplaces, the pantry door, and the window proportions on the whole south elevation.
We removed: everything added after 1960.
The kitchen took eleven months and roughly forty drawings, and the disagreement was never about style. It was about whether to put an island in it.
The clients wanted one, because every kitchen they had admired for ten years had one. We thought the room was too narrow, and that an island would turn a generous space into two corridors. Neither side was obviously right, so we did the only useful thing: we taped the island out on the floor at full size and asked them to cook dinner around it for a week.
They called on the fourth day and asked us to take it out.
What went in instead was a long work table that can be moved, a deeper run of counter on the north wall, and the stone sink under the window, which is where the person washing up actually wants to be. The room is better for the argument, and we would not have got there by being right at them in a meeting.
We under-specified lighting in the back hall and had to add two fittings after the plaster was finished, which is an expensive way to learn something we already knew. And we would push harder, earlier, on the mudroom: it was the last room designed, it got the least attention, and it is the room the family uses most.
A new build on a steep lakeside lot, for clients who wanted a house that looked like it had always been there without pretending to be older than it is.
The site did most of the design work before we arrived.
The lot drops nearly forty feet from road to shoreline, which meant the architects had already resolved the big questions by the time we came on: the house steps down the slope in three plates, and almost every room has water on one side and rock on the other. Our job was the inside, and specifically the problem of a house with a spectacular view in every direction.
That sounds like a gift. In practice a house like this can become a corridor of windows that nobody wants to sit in, because there is nowhere to put your back. Most of what we did was build places to sit with your back to something solid.
The palette came out of the site in the most literal way. The timber is Eastern hemlock, milled from trees cleared for the driveway, and the stone in the hearth and the bathrooms was quarried about ninety minutes away. Both were cheaper than importing something more refined, and both anchor the house in a way an imported material would not have.
Against that we kept the textiles soft and slightly imprecise: undyed wool, heavy linen, a lot of it washed before installation so that nothing looked tense. The clients have two large dogs and a boat, and a house like this needs to survive wet things being put down on it.
Nearly everything built-in was drawn by us and made by a cabinetmaker in Glens Falls who has now worked on four of our projects. On a house this size, custom joinery is usually where the budget goes to die, so we were deliberate: we spent it on the three pieces people touch every day and bought the rest.
A lake house is really a machine for dealing with wet things.
Washing the textiles before install was the single best decision on the project and cost almost nothing. We now do it as standard. We also over-thought the lighting plan for the main room and ended up removing a third of the fittings during commissioning, which the electrician was very gracious about.
Hollis & Vane was founded in 2014. There are six of us. We take on four or five projects a year, which is fewer than we could, and that is the point.
We started the studio because we wanted to stay on projects longer.
Nadia came from a large architecture practice in New York, Reuben from twelve years of furniture making. Both of us left for roughly the same reason: the work we cared about was the slow part, and the slow part was the first thing cut when a practice got busy.
So the studio is built to stay small. Six people, four or five projects a year, and a principal on every one of them from the first conversation to the day the furniture lands. We do not have a business development department. We have never pitched for work in a competitive bid, and we do not intend to.
Old houses, mostly. Buildings that have been altered badly and need somebody patient enough to work out which parts are original, which parts are worth keeping, and which parts are simply in the way. That work is slow and unglamorous and we genuinely enjoy it.
We are also good at the long middle of a project, which is where most of the value is and almost none of the photographs come from. Schedules, specifications, site visits, and answering a builder's question the same day instead of three days later.
We are not decorators, in the sense that we rarely come in at the end to furnish a finished house. We are not fast. And we are not the right studio for anyone who wants a house that looks like a particular magazine, because the honest answer is that we will spend your money arguing with you about it.
The best compliment we get is that a room looks like it was always that way.
Nadia Hollis leads design. She trained as an architect, spent nine years at a large practice in New York, and is the person who will make you sit in a dark room at eight in the morning to prove a point.
Reuben Vane leads detailing and delivery. He made furniture for twelve years before the studio, which is why our drawings are more specific about joinery than most, and why our cabinetmakers tend to stay with us.
The rest of the studio is four designers, one of whom has been with us since the second year. We are in a converted feed store on Garden Street in Rhinebeck, with a workroom full of samples that visitors are welcome to handle.
Three ways to engage the studio, one process. We are deliberately plain about scope and fees, because almost every difficult conversation in this industry comes from being vague about them early.
Two hours, usually in your house, free of charge. We want to know how you actually live there: which rooms you avoid, where the mail lands, what you have been meaning to fix for six years. Most of what makes a project good is decided here.
Layouts, light studies, and a material palette you can physically hold. We work in samples rather than renders. A render is a promise nobody can keep; a box of stone and timber and fabric is an honest conversation.
Drawings a builder can price and build from, plus schedules, specifications, and the long unglamorous list of decisions that prevents surprises on site. This is the least photogenic stage and the one that protects your budget.
Regular site visits, fast answers to the builder, and a principal present throughout. We stay to the last day, when the furniture arrives and the house finally reads as one thing rather than a series of rooms.
The full scope, from survey through to install. Suited to whole-house renovations and new builds where the plan itself needs work. This is most of what we do, and the projects we are proudest of.
Typically 12 to 24 months. Fee as a percentage of construction cost.
Where the architecture is resolved or unchanged, and the work is finishes, joinery, lighting and furnishing. Often alongside another architect, which we are happy to do.
Typically 6 to 14 months. Fixed fee by scope.
A day with the studio for people who are managing their own project and want a second opinion on a plan, a palette, or a decision that has become stuck. No ongoing commitment.
One or two days. Day rate.
We quote a percentage of construction cost for full-scope work and a fixed fee for interiors, and we tell you which one applies at the first conversation. We do not take commission from suppliers, and when we specify something we are not being paid to specify it. If a trade discount exists, it passes to you.
We will also tell you early if we think your budget and your brief do not meet. That conversation is uncomfortable once and extremely cheap compared to finding out eight months in.
Mostly the Hudson Valley, the Catskills, and New York City, plus occasional projects in New England. We generally decline work that we cannot reach in a morning, because site presence is a large part of what we are actually selling.
Notes from the studio on materials, process, and the things we got wrong on site. We write when we have something worth saying, which works out at eight or nine times a year.
We specified it on four projects in a row and then went back to look at all four. What it does well, what it does badly, and who should not use it.
Marble marks, limestone stains, and soapstone does both. Every durable surface is a negotiation with patina, and most clients decide too quickly.
The rooms people love most in our projects are usually the ones we stopped working on early. An argument for restraint, with photographs.
It is the room your family uses most and the room that gets designed last. A short argument for reversing that order, drawn from getting it wrong.
A small, cheap step that changed how our interiors look on day one. Also an explanation of why new linen looks so tense.
How we work out what is original, what was added, and what is load-bearing, before anybody picks up a crowbar.
We specified it on four projects in a row, then went back a year later and looked at all four with the clients. What it does well, what it does badly, and who should not use it.
Lime plaster is the most oversold material of the last decade, and we still use it.
Both of those things are true, which makes writing about it awkward. It has been photographed so relentlessly that clients now arrive asking for it by name, usually having seen it in a room shot at the exact hour of the exact day when it looks best. So in the spring we went back to four houses where we had specified it, between ten and twenty months after completion, and asked the people living in them what they actually thought.
The thing lime plaster does that no paint does is hold light badly, in the best way. The surface is faintly irregular, so instead of reflecting evenly it gathers light in some places and loses it in others, and the wall changes noticeably through the day. In a north-facing room this is the difference between flat and alive.
It is also breathable, which matters enormously in old houses with no vapour barrier. At Ridgeview the walls are solid, there is no cavity, and a modern impermeable paint would have trapped moisture in the fabric. That is not an aesthetic argument, it is a building one, and it is the reason we first started using the material.
And it ages in a way most people like. Small knocks burnish rather than chip. After a year, the wall around a doorway in a busy house has a soft patch where hands have been, which reads as use rather than damage.
It gets better at exactly the rate paint gets worse.
Now the honest part, because this is where clients get surprised.
This is the big one. If you damage a painted wall, you repaint a patch and in most cases nobody can tell. If you gouge lime plaster, the repair is visible, because the finish is a product of how one person worked one surface on one day. In two of the four houses there was a repair that the owners could point to immediately. In one they had stopped noticing. In the other they had not.
Sealed and specified correctly it is fine in a bathroom. Specified casually it is not. We had one shower surround where water was sitting on a horizontal detail and the finish softened. That was our detailing error rather than the material failing, but it is the kind of error the material punishes and paint forgives.
The material is cheap. The finish is entirely in the hands of whoever applies it, and the gap between a good plasterer and an adequate one is enormous and invisible until the wall is dry. We now work with two people and will delay a project to get one of them rather than take whoever is available.
We still specify it, on about half our projects, and we have changed three things. We sample on site rather than in the studio, on the actual wall, in the actual light, and we leave it up for a week. We write the maintenance reality into the handover document instead of mentioning it in a meeting. And we budget a small sum for a plasterer to return at twelve months, because by then the clients know which three spots bother them.
That last one has been the most useful change by some distance. It converts the material's main weakness into a scheduled visit rather than a slow irritation, and it costs less than the arguing it prevents.
We take on four or five projects a year and usually book nine to twelve months ahead. If the timing is wrong we will say so plainly rather than keep you waiting.
We take on a small number of residential projects each year, most of them in the Hudson Valley and New York City.
Start a conversation